<p><!-- wp:paragraph --></p>
<p class="">The Harborview Bond Program will continue geotechnical work on the eastern side of the Harborview Medical Center campus on <strong>September 17, 2025</strong> at the 319 Terry Ave. property from 8 a.m. to 5 p.m. <a href="https://www.haleyaldrich.com/" data-type="link" data-id="https://www.haleyaldrich.com/" target="_blank" rel="noreferrer noopener">Haley & Aldrich</a> engineers will take soil samples for analysis to ensure the temporary modular building construction meets safety and environmental regulation and disaster preparedness protocols (in case of earthquakes, flooding, or other unexpected events).</p>
<p><!-- /wp:paragraph --></p>
<p><!-- wp:paragraph --></p>
<p class="">The work follows geotechnical work completed near the intersection of Jefferson Street and 8th Avenue between Jefferson Terrace residences and the West Hospital Sept. 2-6, 2025.</p>
<p><!-- /wp:paragraph --></p>
<p><!-- wp:paragraph {"className":"#registration_button wpem-theme-button {visibility:hidden;}"} --></p>
<p class="#registration_button wpem-theme-button {visibility:hidden;}">Learn more about the drilling work at <a style="color:#0000ff" href="/Drilling">HarborviewBondProgram.com/Drilling</a>.</p>
<p><!-- /wp:paragraph --></p>
<p><!-- wp:image {"id":9775,"sizeSlug":"large","linkDestination":"none"} --></p>
<figure class="wp-block-image size-large"><img src="https://harborviewbondprogram.com/wp-content/uploads/2025/08/Geotech-Drilling-319-Terry-Site-1024x1024.jpg" alt="Map of the drilling site and neighboring apartments" class="wp-image-9775" /></figure>
<p><!-- /wp:image --></p>
<p><!-- wp:paragraph --></p>
<p class="">
<p><!-- /wp:paragraph --></p>
- Harborview Bond Program
- 206-477-9400
- 401 5th Ave, Seattle, WA 98104